3503-J307机组试车条件确认记录
            
                - 资料大王PDF
 
                - 
                    0 次阅读
 
                - 
                    0 次下载
 
                - 
                    2023-12-21 20:14:54                
 
            
            
         
        
        
                    
                
            
                
                微信
             
            赏
            
                
                支付宝
             
         
                        
        
            文档简介:
            
 
SH/T 3503-J307 
机组试车条件确认记录
机组试车条件确认记录 
Machine Train Ready for 
Commissioning Review Record  
工程名称: 
Project: 
单元名称: 
Unit: 
Description 
 
Item No. 
 
Model 
 
Capacity 
 
Driver Type 
 
Revolution 
rpm 
Item 
Technical Requirement 
Confirmed by 
Date 
Discipline 
Engineer 
Construction 
Contractor 
Discipline 
Engineer 
Supervision 
Contractor 
Discipline 
Engineer 
General 
Contractor 
Equipment 
Dismantling 
Inspection 
Dismantling inspection and 
restoration shall be completed. 
Records shall be made in accordance 
with the applicable code 
requirements. 
 
 
 
 
Auxiliary System 
The system shall be verified as 
acceptable. 
Oil Piping System 
Flushing and pressure test shall be 
completed. Records shall be made in 
accordance with the applicable code 
requirements. 
Circulating or Lube 
Oil  
Applicable requirements shall be 
met. 
Electrical Facility 
Installation shall be completed, 
testing qualified, and records made 
in accordance with the applicable 
code requirements. 
 
 
 
 
 
Instrument Interlock 
and Control System 
Installation shall be completed, 
system testing qualified, and records 
made in......
        
                
                    
     
    
评论
发表评论